
Clearwater Beach restoration: high-rise resorts, beachfront condos, and Sand Key towers

North Beach & Mandalay
The north stretch of resort high-rises along Mandalay Avenue — hotels, beach-club towers, and resort condos with constant guest turnover. Exterior coatings, balcony work, and waterproofing sequenced to keep rooms in service.

Pier 60 & downtown beach
The heart of the island — Pier 60 hotels, beachfront resort towers, and the high-traffic stretch along South Gulfview. Restoration sequenced around tourism peaks, pier events, and continuous public access.

Sand Key
High-rise condo towers stacked along Sand Key — 12-to-20-story buildings facing full Gulf weather and bay-side waterways. Phase 1 inspections, structural concrete, Milestone-compliant restoration, and 30-year recertification work.

South Beach & Clearwater Pass
South of Pier 60 and along the Clearwater Pass channel — mid-rise condos, hotel-condos, and the wall of buildings facing the Sand Key Bridge approach. Coastal-grade sealants, balcony rehab, and façade work for buildings on both sides of the pass.

Island Estates & the bayside
The bayside neighborhood off Memorial Causeway — Island Estates waterfront homes, small condo buildings, and canal-front properties. Different exposure than the Gulf side but still humid, salty, and demanding on building envelopes.

Belleair Beach approach
South across the Sand Key Bridge into Belleair Beach and Belleair Shore — the transition from the Clearwater Beach high-rise wall into smaller waterfront homes and condo buildings. We work the full corridor without subbing any of it out.
OUR PROCESS
Every Barrett project follows the same five-step process so there are no surprises.
01
Walk-through and free consultation
Initial site visit to understand the building and your goals.
02
Photo-documented inspection and prioritized scope
Every defect is documented and ranked by urgency.
03
Detailed proposal with line-item pricing
Schedule, products, and warranty terms in writing.
04
Execution with resident communication plan
Pre-construction meeting and phased scheduling that minimizes disruption.
05
Closeout with final walk and warranty docs
Punch list, warranty documentation, and a maintenance plan.
Do you work on Clearwater Beach high-rises and resort towers?
Yes — Clearwater Beach high-rises and Sand Key towers are core to our practice. We're 25–35 minutes from our Pinellas Park base across either the Memorial Causeway or the Sand Key Bridge. We handle Phase 1 inspections, structural concrete, balcony rehab, and full exterior restoration on towers up to 20+ stories.
Can you work around resort occupancy and tourism peaks?
Yes. Clearwater Beach resorts and hotel-condos run year-round, so we sequence work by floor, stack, and elevation to keep rooms in service. Loud or disruptive work gets scheduled for shoulder season when possible, with phased communication plans for guests and residents.
How fast can you get to a Clearwater Beach building?
Same-day site visits, every time. We're 25–35 minutes from our Pinellas Park base via Memorial Causeway or Sand Key Bridge — no waiting for an outsourced sub or an out-of-area contractor to drive in from Tampa.
Do you handle SB-4D and 30-year recertification inspections?
Yes. Clearwater Beach has a high concentration of mid-rise and high-rise condos crossing SB-4D thresholds. We handle Phase 1 Milestone inspections, Phase 2 structural integrity studies, and the restoration that follows — sequenced and documented to satisfy what the law requires.
Are you licensed and insured?
Yes. Florida-licensed general contractor, license CBC1266604. Fully insured with general liability and workers' compensation.
What's the best time of year for exterior work on Clearwater Beach?
Late fall through early spring is ideal — lower rain, lower humidity, lower wind, and fewer guests in the rooms. But Clearwater Beach is a year-round destination, so we plan around weather windows, with materials chosen for each season's conditions.