
Pressure cleaning & surface prep
Pressure washing to bare stucco, fungicide treatment for mildew and biological growth, scraping of failed paint, and full surface preparation. Without proper prep, even the best coating system fails, so we take the time to do it right.

Stucco repair & crack treatment
Hairline and structural cracks get routed, filled with elastomeric crack sealant, and prepped to receive paint. Loose or hollow stucco areas are removed and re-rendered with matched mix and texture before painting.

Elastomeric coating systems
High-performance elastomeric coatings that flex with the stucco, bridge hairline cracks, and breathe out trapped moisture. Engineered for Florida UV and salt air, with manufacturer warranties of 10 years and beyond.

Color consultation & sampling
Color selection is a major decision — and difficult to undo. We provide on-building sample drawdowns in your selected colors, evaluate them in morning and afternoon light, and help boards arrive at a final palette before the work starts.

Lift, scaffold & boom access
Towers and complex elevations require the right access: articulated boom lifts, scissor lifts, scaffold systems, or swing stage rigging. We engineer the access plan, secure the necessary permits, and protect landscaping and parking during the work.

Resident communication & sequencing
Painting a building with residents in it requires more communication than carpentry. We provide 72-hour advance notice on the work area, cover and protect balcony contents, and schedule sequencing so people can use their balconies between phases.
OUR PROCESS
Every Barrett project follows the same five-step process so there are no surprises.
01
Walk-through and free consultation
Initial site visit to understand the building and your goals.
02
Photo-documented inspection and prioritized scope
Every defect is documented and ranked by urgency.
03
Detailed proposal with line-item pricing
Schedule, products, and warranty terms in writing.
04
Execution with resident communication plan
Pre-construction meeting and phased scheduling that minimizes disruption.
05
Closeout with final walk and warranty docs
Punch list, warranty documentation, and a maintenance plan.
BEFORE THE NEXT REPAINT
The chalk test
Rub a dark cloth across a sun-facing wall. A heavy white residue means the binder in the paint has broken down and the pigment is sitting loose on the surface. Some chalking is normal with age. When it comes off in a thick layer, the film has thinned and is no longer shedding water the way it should.
Cracks, blisters and peeling
Fine map cracking that follows the stucco usually means the coating has lost its flexibility. Blisters point to moisture trapped behind the film, often from a failed sealant joint nearby. Peeling at window heads and slab edges is a warning that water is already getting behind the paint, and painting over it will only hide the problem for a season or two.
Mildew is another clue. Dark growth that returns quickly after cleaning usually means the surface is staying damp, either because the coating has worn thin or because water is getting in from somewhere above.
Planning the repaint cycle
Most associations carry exterior painting as a line item in the reserve study. Catching the decline a year or two early gives the board time to budget, sample colors and line up related work under one mobilization.
Repainting is also the natural moment to replace tired joints, so we usually scope it together with waterproofing and sealant replacement. The scaffold or lift is already in place, and new paint goes onto walls that are sealed properly underneath.
How long should an exterior paint job last in Florida?
A quality elastomeric system properly prepped and applied should last 8-15 years in Florida. Cheap acrylic latex on poorly prepped stucco will fail in 2-4 years. The system, prep, and application matter far more than the brand on the bucket.
Do you do the prep work yourselves or sub it out?
All prep — pressure washing, stucco repair, crack routing, caulking, masking, priming — is done by our in-house crews. Prep is 80% of a successful paint job, so we don't trust it to subcontractors.
What paint system do you recommend?
For Florida exteriors we typically specify Sherwin-Williams Loxon XP or Benjamin Moore Aura Exterior over the correct primer for the substrate. The right system depends on whether you have stucco, CMU, wood, or metal, and on the existing coating's condition.
What's the warranty on an exterior paint job?
We provide a 5-year workmanship warranty on top of the manufacturer's coating warranty (typically 10-25 years). If the paint fails because of how we prepped or applied it, we come back and fix it.
Are you licensed and insured?
Yes. Florida-licensed general contractor, license CBC1266604. Fully insured with general liability and workers' compensation.
Can you match a discontinued or custom color?
Yes. We bring a spectrophotometer to match an existing color from a clean sample, then create on-building drawdowns so you can see the match in your actual light before we commit to gallons.
